7.11.09

Its arrived !!!

Just after I said "not much to report" it's turned up! Crawled into bed just after 7am, after night shift and about 7.30 Francine says "I think your shed's here" Well that's worth getting up for!...I think?












Well that's it, can't say I can see 5 1/2 K in that little pile of bits but time will tell. I should mention that there is an entry door kit, 4 boxes of hardware and the insulation just out of shot, but still! Now where did I leave that concrete trowel??

31.10.09

October 'roundup'

Not to be confused with the bovine kind or the herbicide, but thought I should throw something in before the end of the month just to keep my monthly average up. No pics to offer this time.

The 'Colourbond Cave'
Not much to report here. The kit won't arrive for another couple of weeks yet. Still toying with the idea of doing the slab myself. I have actually poisioned the grass were it will go so I suppose that constitutes a start ??. Hoping for a pre Christmas lockup.

Onthe Bench
Got some paint and decals on the plow vans from the previous post. Waiting for some FreightRail blue to come in. Have given the Runway13 compressor a workout. What a good thing. Had the opportunity to try one of Peter's double action airbrushes out at Liverpool, something I had always been apprehensive about, and I'm a convert. Sorry Paasche H, the future is not looking good!

Some wiring on the 32 has been done. What I'm starting to realise is that once I wire up the decoder I wont be able to separate engine and tender to I might have to some painting first. Headlight has bee bored out to accept LED. Not as much room in there as I thought, turning out to be a little more difficult than first thought.

The Liverpool Exhibition (and the 38's)
Like many I attended this modeling and spend-fest. Helping out on the Eureka stand on Sat and Mon whilst still getting a look around and giving Ron an occasional break. Nothing new here, been doing this for several years now but this year was a bit different - the 38's are here ! Such a variation in reactions from the punters. A few had to be reassured they were not dreaming and that the ones on display were actually for sale! I think the thing that amazed me the most was the number of conversations that started with "I've heard a rumor..." or "Someone told me that...". Some so concerned with number of alleged "defects" they almost needed counseling!

The major source of all this reliable information - on-line news groups or forums. According to a reliable source, I don't go near the things, there was in excess of 70 pages of discussion on the quality and performance of the product even before the first pre production models existed and before the actual models available for retail arrived it pipped the 100 mark.

No one would argue that with such an iconic loco as the NSWGR 38 class Pacific the rivet counters were always going to have a field day. I often wonder if those that choose to take a dump on a particular product or manufacturer ever consider the consequences of converting every thought that pops into their head into a post on a forum or, dare I say, a blog! I'll go out on a limb here and say that less than 1% of these geniuses would have even the faintest idea what it takes to turn an idea into a sellable, working model, that will run well on a variety layouts (the variety I'm referring to is track specs) and not just look pretty on a shelf.

Most reports coming in are positive. The performance is petty well prototypical in terms of load versus grade and the sound is genuine. This statement is actually based on fact! I have seen, and heard, Eureka 38's performing duty on Werris Ck. Hauling 5 (6 at a pinch!) Lima passenger cars up 1:40 curved grades. Five of our Friday nighters' took delivery of their 38's and every one was given a test run, without problems.

It has been along wait, 1 month short of 5 years actually, but I think it has been worth it. Ron's motto during this time has been "Do you want it now, or do you want it right". Well done Ron and good luck with the rest of the projects.

That'll do. Got to remember this is a post, not a novel.

Cheers.

8.10.09

Plow Vans

Almost ready to head for the paint shop (and an excuse to christen the new air compressor from Runway 13 !) are NZBF 1041F and BBP 1049X. These two wagons represent the same plow van at different stages of its life. Pretty much the same under frame with revised body arrangements. They were an integral part of most ballast trains and ran to every corner of the state, so would be at home on just about any layout with only the type being era specific.

I've had a temporary secondment from the Large Erecting Shop over to the Wagon Works and two wagons that are way past their contracted delivery date have been brought to my attention.

These fellows are both Hanovale kits, which are currently 'off line' at the moment and not producing, whilst these are not, in my opinion, high quality castings, Hanovale produce a line of products which fill a market segment which is, generally, not served by another producer in terms of individual models. I hope Hanovale comes to a point where production can commence again in the near future.

These kits both require a fair amount of patience and a light touch as the chosen material is quite brittle and does not respond well to a 'blacksmiths' approach. Whilst excess flash on the resin castings is not a problem there is some on the small white metal/pewter castings (steps) which must be removed with great care with a fine file. The resin body castings required some filler but not a great deal which was pleasing for this type of casting material as well as a fair amount of sanding with some fine wet and dry to remove molding imperfections and blemishes. A better model would have resulted from some more under floor detail (brake gear) cast separately in another material rather than 'half casting' as part of the floor.
Some skill with the soldering iron is required in both cases, particularly in the case of the hand rails for the NZBF. Hanovale has included a jig for these hand rails and it works quite well despite looking a touch confusing initially. I used Zap CA for assembly which resulted in almost permanently connected fingers a couple of times but it bonds the material well. The roof on the BBP was over length and required a 'cut and shut' to bring it into size with the body. I used my recently acquired Proxxon 58mm table saw which did a near perfect job. When it came time to join the two roof halves together again, the joint required almost no filler. Proxxon makes some great gear. Check them out.
These are definately 'modellers models' and not for the beginner, careful reading of the instructions in required, but these also include a fair bit of prototype info as well. Whilst they do require a fair amount of work, this, in my my view, is a plus. The finished product will reflect the amount of time, care and effort you put in and refine (or wake up!) your modelling skills and that has to be a good thing.
If you have some of these kits in storage they may become 'collectable' if Hanovale does not start up again, which I hope they do. Dig 'em out, dust 'em off and get modelling!

28.9.09

Speakers ain't speakers, or size doesn't matter ! (32 update)

Sorry I have been a bit preoccupied with 'the cave' of late so here is the latest from the LLC & WW bench. I have a few other rolling stock entries to come but photographing them is proving a little difficult. The pics below are taken with the latest aquisition, a 2nd hand Canon EOS 30D. They are large files, approx 3 mb each, so let me know if they prove difficult ot tedious to view and next time I will reduce the file size

After a long wait the sound gear for the 32 arrived the other day from the states.
An initial mix up actually turned out to be beneficial from a learning perspective anyway. I had ordered a "light steam" Tsunami decoder with a Digitraxx Mega Bass speaker, I received a "DGRW K class" decoder and a QSI speaker.

As it turned out the K class decoder is the better choice for a 32 in terms of sounds. The QSI speaker(1 watt, 8 ohm) on the other hand it too large for the 32 tender and has no mounting points. I have put this aside for a future project. The Mega Bass speaker has approx the same size cone and magnet as the QSI speaker, comes with a mounting plate and is physically a smaller unit in all dimensions, it is also rated at 2 watts ! double the output of the physically larger QSI speaker. An extra watt may not sound like much but that is a 100% increase in power output!

I have never claimed to know the in's and out's of DCC let alone throwing sound into the equation, so this will be a learning curve for me as well. Hopefully the specs will prove them selves and the adage that "size doesn't matter" will be proven true.

This pic shows the diference in the size between the two speakers.
The Mega Bass speaker is in the foreground.














Soundtraxx decoder and Mega Bass speaker in situ. The speaker also includes a template (left) which is handy for installation.
If I'd known this was going to be a sound job I would have done all the drilling prior to folding/asembling the tender. I will also experiment with a scratch built speaker enclosure to see if this improves the quality of the sound as the tender body will not be a good acoustic seal.

25.9.09

The first step

I received a large envelope in the mail this morning bearing the Wollongong City Council logo on the front. With much trepidation I opened it up and carefully examined the contents. It contained the Development Application Consent and associated construction certificate paperwork for the Colourbond cave !!

No restrictions, or objections, to building right on the boundary and only a few realistic requirements for building in a bush fire prone area. Mind you some of the jargon and terminology may as well be written in ancient Hebrew for all the sense it make to me but I will persevere and seek 'council' from those more enlightened in such things.

This is going to take a little time to get my head around the fact that I may have a shed by the end of the year. Think I will go and give my FairDinkum supplier a call with the good news, I'm sure he will be impressed!

So it begins.....

23.8.09

A Milestone

We usually have a few of them on life's journey (isn't that profound!?) Getting married, having kids, first house (and usually first mortgage), first car, first kiss, first time your kid's ignore you completely, etc, etc, you know what I'm talking about.

I had a sort of a milestone recently, I discovered that I'm the youngest member of our modeling 'group' ! I turn 47 in a bit over a week and I'll be honest, I never expected to be the youngest member of anything ever again! It was a pleasant surprise, mind you the two guys who I thought were younger than me definately look like they have a lot less k's on the the clock!

I had another genuine milestone a few days ago, I submitted a DA to council for my first shed! A backyard haven, a retreat, a colourbond cave, manland (apparently-not real sure about the conclusions one could draw from referring to it as "manland"), what ever you call it, it's 48.75 sqm (7.5M x 6.5M) of space to build a layout in. Now unlike council who said "about 6 weeks" when I enquired how long should it take to be approved, just after asking me for $670 in lodgement fees, my good wife approved this after the first request with the only condition being that some of the 'under layout' space be used for general storage of stuff. I can live with that!

So now the saga starts. I don't imagine this will go smoothly, I live in a "bush fire prone area" which generated about another 5 pages of paperwork and want to build pretty well on the boundary because I have a small back yard. It's going to be interesting. I will keep you posted.














Future site of the Colourbond Cave !

5.8.09

32 class update #1


Following on from the "marker light" post I actually got in a bit of work shop time today and fitted the marker lights and associated electrical conduit/junction box in 0.4 mm brass wire, the boiler handrail/smoke box brackets and the cab roof. The hand rail is formed from a single length of 0.5 wire and takes about 1/2 an hour of judicious bending to get it right. I actually got the bends in the right places the first time which is unusual - for me.

I also had a go at filing the marker light handles a bit smaller to get them in scale, but you would never notice!

The head light is in the milling shop getting bored out to accept a yellow gold LED from Gwydir Valley Models and should pretty much be the last visible part to go on. Uncharted territory from now on so it should be interesting. Any tips from anyone who has done this before would be much appreciated! The front buffers and coupling, painted separately, will come later after the buffer beam is painted red, this makes a huge difference to the appearance of this area on the finished product.

The whole loco was looking a bit ordinary as I had given it an overnight bath in white vinegar to arrest the corrosion being caused by the soldering process/flux. Using white vinegar neutralises the flux but leaves an inert, dark, kacky (?) film on the surface of the metals, so I have given it a clean up with a fibre glass burnishing brush (pen). These are and invaluable tool when working with white metal and brass and nothing else does a cleaning job like it. A spinning metal wire brush is, in my opinion, way to brutal when working with plug in detail parts. These are available from Casula Hobbies at Liverpool and Tom's Hobbies at West Ryde. Don't forget to buy some refills at the same time as they do a great job but don't last very long.